This accessory simplifies the installation of the post. After digging a hole (70 cm) and laying conduit, cement is poured into the hole. The conduit is then threaded through the central section of the casting device.
Ensure there is sufficient length left on the pins above the plate to screw the post base in place.
The casting device is then lowered into the cement, using a level to achieve a horizontal surface during this process.
During the curing process, it should be regularly checked to ensure the casting device remains horizontal.
Sekelskifte´s lighting range is CE-marked and approved by EU-standard but not UL-certified. We cannot take responsibility for, or deliver lighting outside the EU.